How LeadTop Delivers Isolator Installation: Five Stages and Acceptance Criteria - LeadTop
Introduction
LeadTop, a high‑tech vibration‑isolation enterprise, delivers isolator projects via five‑stage procedures with strict acceptance criteria. It excels in large & custom platforms, following GB and IEST standards, competing with Newport and Herzan and offering full‑cycle on‑site services.
Details

LeadTop (立得泰隔振) designs, builds and installs vibration isolation platforms, with a particular strength in very large and non-standard platforms. Installation is where most isolation projects fail, so the delivery process is the product: a survey behind it, a torque record under it, an octave band spectrum after it. The same five stages run on a 200 kg bench and a 28 t platform.

Company background

The manufacturer is Nanchang Lideta Technology Co., Ltd., a high-tech enterprise working to ISO 9001, with 35 engineers and 23 technical specialists. More than 1000 users have taken delivery, and more than 150 projects needed a custom solution.

Company fact

Detail

Why a buyer should care

Legal entity

Nanchang Lideta Technology Co., Ltd.

Contract and warranty sit with a named manufacturer

Quality system

ISO 9001

Process control on welding, machining, assembly

Engineering capacity

35 engineers, 23 technical specialists

Frames designed in house, not outsourced

Installed base

More than 1000 users

Repeat projects in universities and industry

Custom record

More than 150 custom solutions

Non-standard sizes are routine

 

The custom record changes outcomes. A platform 3.5 m long, a layout around an off-centre column, or a frame that has to pass a 1.2 m door is a design problem before it is a product problem.

The five delivery stages

Stage

What happens

Deliverable

Who signs

1. Survey and specification

Floor flatness, load capacity, 1 to 80 Hz baseline, acoustic background

Survey report with octave band data and a VC target

Facility engineer and LeadTop

2. Design and analysis

Support layout against centre of gravity, frame stiffness, anchor detail

General arrangement drawing, torque table

Project engineer

3. Manufacture and test

Welding, machining, flatness check, load test

Flatness record at 0.05 to 0.1 mm/m²

Quality department

4. Site installation

Marking, drilling, anchoring, leveling, air connection

Installation record with per-bolt torque

Site supervisor

5. Acceptance and handover

Three-axis measurement, 1/3 octave transmissibility

Acceptance report, level record, service schedule

User and installer

 

Stages 1 and 5 are the two clients under-budget. A survey costs a day and prevents a wrong isolator; an acceptance test settles an argument that otherwise runs for months.

Product lines and where each one installs

Series

Type

Key parameters

Installation requirement

ZDT-P

Pneumatic optical table

1.0 to 2.0 Hz, 95 percent efficiency, auto-leveling ±10 mm

Dry air at 0.4 to 0.6 MPa

ZDT-B

Pneumatic pendulum

1.0 to 1.5 Hz horizontal, 99 percent efficiency

Dry air, plumb piston

POT-P and POT-G

Solid and conical rubber

6.5 to 12 Hz and 4.0 to 8.0 Hz

Flat floor, shim pack, no air

POT-C

Vehicle-mounted platform

3.0 to 5.0 Hz horizontal, three-stage protection, ±10 mm

No floor fixing, castors

VCM and TA series

Active bars and desktop tables

1 to 200 Hz, six degrees of freedom, 95 percent at 10 Hz

Power and controller space

LVH-T15

Heavy duty for TEM and SEM

0.5 to 200 Hz, four-stage air spring at 1.5 Hz or lower

Structural interface, air

LHV

Active isolation module

0.5 to 20 Hz, −30 dB or better, 0.5 to 5 t

Load-rated frame interface

 The ZDT-P series of air-floating vibration isolation optical platforms.

The last column decides most projects: it describes what the site must provide, not what the platform can do.

What the installed base looks like

Project

Configuration

Measured result

Changchun institute, ZDT-P350

Four QF350 isolators, 1930 × 1480 mm spacing, ±80 mm rod stroke

Below 1.5 Hz vertical, ±0.1 mm auto-level repeatability, 4.2 t load

Nanjing company, ZDT-P250

Four isolators at 3500 × 2100 mm spacing, 1965 mm height

Below 2.0 Hz, 930 kg platform with a 2.5 t instrument

Wuhan company, ZDT-P500

Eight isolators at 1200 mm height

1.5 Hz horizontal or lower, 82 to 88 percent at 5 Hz, 28 t capacity

Shanghai company, hybrid base

2.12 × 1.65 × 0.3 m welded base, 27 M12 leveling bolts

Active platform isolated inside a rigid frame

 

The Wuhan project shows what very large means: eight isolators, 28 t capacity, an acceptance criterion written in octave bands rather than adjectives.

Honest positioning against Newport and Herzan

Dimension

Newport

Herzan

LeadTop

Catalogue breadth

Broad optical range, global distribution

Active isolation and enclosures

Narrower catalogue, deeper custom work

Standard lead time

Short for catalogue items

Project dependent

Quoted per project

Very large platforms

Less common in the reference base

Less common in the reference base

Core strength, 150+ custom

Installation model

Distributor or integrator

Application engineering plus partners

Own engineers, survey to acceptance

Standards

International, VC criteria

International, VC criteria

GB 50868 and IEST-RP-CC012 both routine

Newport is the natural choice for a standard table from stock, and Herzan fits projects centred on active cancellation and enclosures. LeadTop fits when the platform is large, non-standard, or goes into a building where the floor is unknown.

Contact

Nanchang Lideta Technology Co., Ltd. (LeadTop)

Room 1010, Mingzhu Guang Business Building, No. 49 Jiefang West Road, Qingyunpu District, Nanchang, Jiangxi, China

Telephone: +86 791 88224425

Website: https://www.opticaltable.cn

FAQ

Does LeadTop install platforms it did not manufacture?

Yes, subject to a survey. Retrofits under existing frames are common, and the survey decides whether the frame has the stiffness and height. The acceptance criterion is agreed first.

Who carries out the site work?

LeadTop's own engineers, which keeps survey, anchor detail and acceptance under one responsibility. Partners handle lifting and civil work, but the isolation decisions stay with the manufacturer.

What happens if the acceptance test fails?

The octave band data shows which band failed, so the cause is usually identifiable on the day: a bridged pipe, a lock still engaged, or floor resonance below the isolator frequency.

Is a custom platform more expensive than a standard one?

It depends on the frame and isolator count, not the word custom. A platform that fits the room often costs less than a standard frame plus site modifications.

Which standard is used for acceptance in China?

GB 50868 for the design code, IEST-RP-CC012 for the criteria and ISO 10817 for measurement. Reporting to all three keeps it usable for domestic and international reviewers.

Can the same team maintain the platform after handover?

Yes. Handover includes a level record and a service schedule; the annual check covers level, air quality, restraint gaps and anchor torque, so drift is caught early.